Caveat Emptor
Nowhere are these words truer than in the construction industry. Everyone involved in construction wants their money's worth...no more, no less. The uninformed are at a disadvantage.

As an owner, contractor, subcontractor, attorney, construction manager, architect or engineer, Tempest Company gives you an extra edge with our professional construction estimates, schedules, project control services, expert services and construction consulting.
Company Updates

Water Treatment & Pollution Control Facilities
12/29/2011
An Electrical Contractor, a repeat client was bidding a series of projects where they needed to define the scope and costs in as much detail as possible.

University Research Laboratory
11/11/2011
One of our mechanical contractor clients wanted to bid at a University where they had done a lot of work in the past.

Retail Store – National Retailer
11/11/2011
A national retailer is considering expansion of their stores.

Waste Water Treatment Plants
11/11/2011
One of our electrical contractor clients identified a series of waste water treatment plants they wanted to aggressively pursue in bidding.

Coal Fired Power Plant – Utility Company
11/11/2011
With recent EPA mandated changes in power plant emissions, our client need assistance in budgeting work that would meet the pollution control requirements imposed upon them.

United States Embassy – Prime Contractor
11/11/2011
A new client had us assist them in developing quantities on a new embassy project.

Child Care Facility - Prime Contractor
11/9/2011
A returning client required some assistance in preparing the budget for the child care center.

Forward Operating Base – Prime Contractor
10/4/2011
A new client came to us for some assistance in the development of the design build estimate on the mechanical and electrical systems for the project.

Hospital Renovation – Electrical Contractor
8/25/2011
One of our repeat electrical contractor clients was invited to bid on the design build renovation of a hospital.

Earthwork Change Order – General Contractor
8/1/2011
One of our clients ended up with a project involving an extensive series of changes to cut/fill and rip rap on the project.

Plumbing Estimates – Mechanical Contractor
8/1/2011
A smaller contractor found himself with more work to bid than could be bid at the time.

County Courthouse – Mechanical Contractor
7/13/2011
One of our clients wanted to bid this project.

City Jail – Electrical Contractor
7/13/2011
An electrical client needed to bid the project.

Bid Evaluations – Owner
7/13/2011
One of our owner clients engaged the services of a construction management firm to construct their facility on a fast track basis.

Law Enforcement Center – Earthwork Contractor
5/9/2011
One of our continuing clients wanted to bid a project that was located in his area of operations.

Restaurant – Insurance Company
5/9/2011
We recently were able to work on a total loss claim on a restaurant fire.

Church – Insulation Contractor
5/9/2011
This is a first time client that found themselves without an estimator shortly before the bid was due.

Wage Rate Study – Industrial Owner
5/9/2011
One of our industrial clients needed to obtain current wage rates for the various regions in the United States.

Library Reconstruction – Construction Manager
5/9/2011
This is a continuation of a project as the design progressed to the next stage.

Estimate Evaluations – Owner/Developer
5/9/2011
An owner for a major project was assembling a total cost estimate for the project.

Office Expansion Project – Prime Contractor
3/28/2011
One of our continuing clients encounters a project that necessitated using our experienced estimators to help in the bidding effort.

Scrubber Installation – Electrical Contractor
3/8/2011
A regular electrical contractor client needed to develop and design build, guaranteed maximum price for a power plant scrubber project.

Prototype Retail Store Cost Studies
3/8/2011
A major national retail client wanted to evaluate the cost of constructing new facilities with many different configurations and material types.

Base Exchange Store Upgrade
3/8/2011
A new client a mechanical contractor, did not have the resources necessary to bid the project in the time frame it was available.